CBL-AG-BPWR with AG52 or AG53
Install a powered Asset Gateway (AG) using the CBL-AG-BPWR cable to draw power from the trailer’s 7-way wiring. This setup mounts the AG on the trailer and connects the cable’s wire leads directly to the trailer-side wiring behind the 7-way socket, providing continuous power for GPS location and trailer status reporting.
Note
To confirm compatibility, see Installation Guides by Asset Type.
To enable real-time trailer connectivity through the 7-way connector, use the following workflow.
-
Activate the device in the Samsara dashboard if you have not already done so.
Log in to the Samsara dashboard at the regional Samsara cloud URL assigned to your organization (such as cloud.samsara.com, cloud.ca.samsara.com, or cloud.eu.samsara.com), or go to cloud.samsara.com/activate. You can also follow the link in your
Order Shippedemail.Caution
Before beginning work on the trailer, ensure it is taken out of service and secured with wheel chocks and a glad hand lock.
-
Select the desired mounting location and clean thoroughly.
-
To mount your AG, follow the corresponding installation instructions for the AG mounting hole type:
-
To secure the AG, first drill pilot holes using an 11/16-inch drill bit. Then, attach the AG using the two provided #8 self-drilling screws.
Caution
To prevent damage to the mounting tabs, tighten screws to a maximum torque of 1.4 Nm (12.4 lbf-in). If using your own screws, ensure they are not larger than the size specified below.
-
Plug the cable into the AG and twist to lock.
-
Attach the mounting bracket to the mounting surface using one of the following methods:
Caution
To prevent damage to the mounting tabs, tighten screws to a maximum torque of 1.4 Nm (12.4 lbf-in). If using your own screws, ensure they are not larger than the size specified below.
-
Self-drilling screws: Use the provided #8 self-drilling screws.
-
Machine screws: Drill through-holes for the mounting bracket and secure it using the provided 6-32 machine screws, washers, and lock nuts.
-
-
Securely mount the AG to the bracket using the two provided machine screws.
Caution
To prevent damage to the mounting tabs, tighten screws to a maximum torque of 1.4 Nm (12.4 lbf-in). If using your own screws, ensure they are not larger than the size specified below.
-
Plug the cable into the AG and twist to lock.
-
-
Run the length of the cable to the 7-way connector and use the zip ties to fasten the cable to the trailer.
-
Connect the wires on the other end of the cable to the 7-way connector:
-
Connect the White wire (ground) to negative.
-
Connect the Brown wire (head/tail lights) to 9-31 VDC power.
-
Connect the Blue wire (ABS/Constant Power) to 9-31 VDC power.
-
Cap the unused Green/White wire (Input 0).
-
-
Cap any unused wires.
-
Complete the AG52/AG53 Device Setup.
-
Manage the trailer from the Samsara dashboard.
Note
If you observe a cable error when you install the AG with the installer app, disconnect and reconnect the cable to the AG. Ensure the cable is correctly aligned with the 7-way connector and securely locked onto the asset gateway.

Comments
0 comments
Article is closed for comments.